News
17 April 2024

On April 21-27, the traffic pattern at the 1492 km of the M-4 Don in the Krasnodar Krai will change

Works to control the damages caused by a landslide at the 1492 km post of the M-4 Don highway — between Mikhailovsky Pass and Vozrozhdenie — are in progress. Road workers have already completed the installation of a permanent reinforced concrete bulkhead that enables to stem landslide processes.

Now the specialists will have to carry out works to restore the road surface. For this time period, on 21-27 April 2024, a reversing traffic pattern with traffic light regulation is introduced.

We ask motorists to treat the works with understanding, to stay careful on the road, to comply with the speed limit and indications of temporary road signs.